Orkney is reported to be a good place to live in a 2017 survery on the BBC website .
At the end of 2016 the survey highlighted a burglary rate in Orkney of just 2.3 per 10,000 people, compared with a Scottish average of 27.2 and 28.7 for the rest of the UK.
Other factors cited as contributing to their quality of life were an employment rate of 87.6%, well above the national average of 73.7%, and a large number of pubs - 20 per 10,000 adults.
Crime clear-up rates are pretty good ( only behind Western Isles and Shetland , and not by much)
And in November 2017 there was no reported crime in Kirkwall
and the annual rate is 15 for all crimes per 1000, copar population compared to 72 crimes in Glasgow (72) , Edinburgh (64), Aberdeen (62) and Dundee (60).
But there has been a crime, as reported on Radio Orkney
Orcadians have expressed their opions about this heinous event
But the report isnt quite accurate . The eggbox that has been illegally removed looks like this .
If anyone has any information, Kirkwall polics would like to know.
Saturday, 6 January 2018
Monday, 11 December 2017
Polycrub part4 :Sheets
The construction notes say that sheeting the polycrub is 'tricky'.
I would prefer a different description .
Fiddly, Awkward, Tedious, Frustrating, timeconsuming, Difficult will do for starters .
The sheets come off a low loader - 7 metres long and about 1200 wide .
First job is to place the sheet over the frame of the hoops. Don't attempt it on a windy day , they suggest. Excellent Advice , I'd add, after rugby tackling one is it tried to make an exit corried along on a brisk westerly breeze. So chossing a not-quite-so-windy day we started.
They are joined by a joining strip
So you need to join 2 sheets, 7 metres long, across the curve of the hoops.
The construction suggestions say several pairs of hands will be necessary. - the plastic joining strip need prising apart enough to slot the next sheet in.
Obviously its something just right for a husband-and-wife team. After our first attempt , i had a chat with Smiddy Cottage Garden Services , who have installed them before.
He asked
So clearly not something for a husband-and-wife team to attempt.
But I got the hang of it.
You need to replace your wife with 4 breezeblocks, 10 metres of rope, sundry wallpaper stripping tools, fish slices and some custom -made plastic wedges.
Firstly, get sheet over hoops, then attach in place with acoupld of clamps at the free end.
Place breezeblocks approximately 6 inches from joining strip , with rope across the sheet to the other side. This will hold the sheet in place ( even when its windy).
The hoop is approx 2.5 meters offthe ground, so you need some access . Several ladders and bit of wood to get the ladders in the right place does the job .
Then.
Hold the joining strip apart with some whatevers, and tap the new sheet into the join. Start at one end and work your way round to the other side. The problem is that the curvatures of the 2 sheets may not be the same . the alignment may not be the same .
You need the wedges, pie slices, wallpaper strippers at various times. Sometimes you need them all together . The rope is a convenient way of stopping them sliding off - well mostly stopping them sliding off - and also provides some leverage to keep the joining strip open.
It took between 90 minutes and 3 hours per join. And then about 20-30 minutes to screw each sheet in place - 21 screws per sheet
The most tedious bit of the whole job ?
Covering the screws themselves with the little plastic cover. It needs cutting off , holding over the screw head then tapping in . OK if you get it first time, but the plastic is quite soft and deforms if you dont get it right first go.
After a few bashed fingers and dropped covers I'll leave this bit for the summer when you dont need thick gloves for working outside . Or i might just put some white mastic sealant over all the screws to make it look nice. Or I might not.
it looks OK with the neat row of screws , doesn't it ?
I would prefer a different description .
Fiddly, Awkward, Tedious, Frustrating, timeconsuming, Difficult will do for starters .
The sheets come off a low loader - 7 metres long and about 1200 wide .
First job is to place the sheet over the frame of the hoops. Don't attempt it on a windy day , they suggest. Excellent Advice , I'd add, after rugby tackling one is it tried to make an exit corried along on a brisk westerly breeze. So chossing a not-quite-so-windy day we started.
They are joined by a joining strip
So you need to join 2 sheets, 7 metres long, across the curve of the hoops.
The construction suggestions say several pairs of hands will be necessary. - the plastic joining strip need prising apart enough to slot the next sheet in.
Obviously its something just right for a husband-and-wife team. After our first attempt , i had a chat with Smiddy Cottage Garden Services , who have installed them before.
He asked
- "how long did the first go had last ?"
- about an hour
- "Wow , as long as that ! "
So clearly not something for a husband-and-wife team to attempt.
But I got the hang of it.
You need to replace your wife with 4 breezeblocks, 10 metres of rope, sundry wallpaper stripping tools, fish slices and some custom -made plastic wedges.
Firstly, get sheet over hoops, then attach in place with acoupld of clamps at the free end.
Place breezeblocks approximately 6 inches from joining strip , with rope across the sheet to the other side. This will hold the sheet in place ( even when its windy).
The hoop is approx 2.5 meters offthe ground, so you need some access . Several ladders and bit of wood to get the ladders in the right place does the job .
Then.
Hold the joining strip apart with some whatevers, and tap the new sheet into the join. Start at one end and work your way round to the other side. The problem is that the curvatures of the 2 sheets may not be the same . the alignment may not be the same .
You need the wedges, pie slices, wallpaper strippers at various times. Sometimes you need them all together . The rope is a convenient way of stopping them sliding off - well mostly stopping them sliding off - and also provides some leverage to keep the joining strip open.
It took between 90 minutes and 3 hours per join. And then about 20-30 minutes to screw each sheet in place - 21 screws per sheet
The most tedious bit of the whole job ?
Covering the screws themselves with the little plastic cover. It needs cutting off , holding over the screw head then tapping in . OK if you get it first time, but the plastic is quite soft and deforms if you dont get it right first go.
After a few bashed fingers and dropped covers I'll leave this bit for the summer when you dont need thick gloves for working outside . Or i might just put some white mastic sealant over all the screws to make it look nice. Or I might not.
it looks OK with the neat row of screws , doesn't it ?
Saturday, 4 November 2017
Everyone should have one
Of course its not used to go round muddy fields, making a mess.
Or to go up and down hills just for the fun of it.
Or to try out the 4 wheel drive in a big puddle of water.
Its got a serious use . Transporting a load of sheep up the hill.
Friday, 20 October 2017
Fee, Fi, Fo, fum
Its easy getting livestock across the pentland Firth.
You deliver a trailer to the ferry terminal on tuesday evening
It sits there overnight. they put it on the ferry at 6am wednesday morning .
It gets taken to Scrabster.
At Scrabster, Phil takes some sheep to the terminal by 6pm.
They put it on the evening ferry coming back
They offload it from the ferry
You take the trailer home and offload its contents
4 Boreray sheep.
All together .
so what else would they be called if not Fee, Fi, Fo and Fum ?
You deliver a trailer to the ferry terminal on tuesday evening
It sits there overnight. they put it on the ferry at 6am wednesday morning .
It gets taken to Scrabster.
At Scrabster, Phil takes some sheep to the terminal by 6pm.
They put it on the evening ferry coming back
They offload it from the ferry
You take the trailer home and offload its contents
4 Boreray sheep.
All together .
so what else would they be called if not Fee, Fi, Fo and Fum ?
Thursday, 12 October 2017
Polycrub Part3 : purlin'd
So the next bit is to attach the purlins.
Straightforward, really.
Except a bit tricky single-handed.
The 4"x3" timbers are 4.8m long. The bottom ones are easy. Just prop up the far end so that it is reasonably level, attache one end to the hoop, go to the other end, get it straight ( well , as straight as you can if the timber isnt straight) then fix it . And then screw it into the hoops in between .
The top one is easy - just get it up there , lay it along the high point of the curve and go up and down a ladder a few times with the newly purchased impact driver in your hand
the ones on the side a tricky. So put a clove hitch round the pipe and secure the timber in the approximate position and do as before
the final result :
the next bit is a bit tricky - attaching 7m long polycarbonate sheeting to the purlins.
This is certainly a 2 man ( at least) job and to be done when its not too windy.
Gale force winds tomorrow, so hopefully ocer the weekend.
Tuesday, 26 September 2017
Polycrub part 2 : Mmmmm
Its not those Golden Arches . The nearest McDonalds is in Elgin, 194 miles away.
I've run out , temporarily, of the ingredients to make concrete , so I've got on with the next bit . They supply recycled hoops from Salmon Farms, which need to be cut to size and then placed over the trimmed posts.
The hoops as they arrive are about 9 metres long. the finished length will be about 6.5 metres.
Cutting the hoops is easy.
Lifting them isnt quite so easy.
Getting it aligned with , and lifted on to the post is a bit tricky. If you get it wrong, the hoop hits you on the head.
Once aligned, sliding them down one post is easy .
Getting the other end of the hoop is tricky.
They are quite rigid .
So when its on one post , it sticks up in the air.
The suggested way to retrieve it , if single-handed is with a rope and pull it down .
And then hauling it down and pulling it onto the second post is hard work
T
Things I have learned
Once its on the post, I suspect there is a lot of sweating and hard work to get the hoop off the post, if necessary . Just as well , as it can be a bit windy in the winter
A tea break
Rain stopped play for the day
|
Saturday, 2 September 2017
Polycrub Part 1
So we have decided that we would like a larger greenhouse. Polytunnels are popular here , but the average life expectancy is 3-4 years ,shredded eventually by the wind. We heard about the polycrub
As they are made in Shetland, we reckoned that a polycrub would be likely to withstand the wind.
We dont have any direct sun for 6 weeks or so through the winter , with the sun reappearing over the hill and hitting the house at the end of January . So the best place to put it would be furthest north on our land that it can reasonably go .
So its going on a bit of the hardstanding out the back .
But there are a several problems.
1. Well-compacted hardcore .
Initially it was going to be raised beds , but on further consideration it would be more flexible to put it on the soil. So the hardcore has to come up . And i think we might need some topsoil . There some being removed from the new hospital site . I wonder what they are doing with the removed topsoil ?
2. A slope
The construction guide is for a level site. We have a slope. When I measure it there is approximately 300mm drop along the northerly edge . So the northeast corner would be 300 mm lower than the northwest corner ( the highest point) . And there is a slope north to south, and the southeast corner will be a further 150 mm lower.
3. bedrock
The installation guide says put the supporting posts in 600mm. Digging down, we hit bedrock after 200-450 mm.
So the first thing is to see if we can drill a hole. Peter the Fencer arranged for some help
and then to drill some holes
And it wasn't just in one spot
And at the shallowest point ,the bedrock is about 15 cm down.
The solution for both the slope and the depth of the holes , is shuttering the posts . Which is what they do in Shetland whne erecting these things and the holes for the posts can't go deep enough
So the gap between the posts is filled with concrete , supporting the posts and getting the whole things level. Hence the cement mixer
Its a bit sheltered where the polycrub is going . We've measured 63 mph
Altogether I reckon I could need 0.7 cu metres of concrete . ive been told by a retired engineer that a cubic metre of concrete weight 2.5 t. So altogther I'll be putting down 1.75t of concrete.
That should hold it .
But i might just run this past a structural engineer for my own peace of mind.
Subscribe to:
Posts (Atom)

















